Replacing the chamber block of Hiblow HP-10/20 Series

Replacing the chamber block of Hiblow HP-10/20 Series
Replacing the chamber block of Hiblow HP-10/20 Series

Step 1

Remove the upper housing according to the picture on page 17. 

Remove the L-tube from the casing nozzle. Remove the installation screws of the chamber block. (4 screws on each side.) Remove the casing block.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 2

Remove the U-lock nut.

• Use the box driver to loosen (or tighten) the U-lock nut.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 3

Remove one of the diaphragm mounting blocks from the actuating rod, and pull out the other diaphragm mounting block with the rod from the pump body. Remove another U-lock nut and the diaphragm mouting block from the rod. This completes the chamber block removal procedure.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 4

FITTING THE CHAMBER BLOCKS


Install a new diaphragm mouting block on the actuating rod. Set the actuating rod in line with groove and tighten the U-lock nut.

• Use new U-lock nut and washer only that come as replacement parts to prevent loosening and causing failure of the pump.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 5

Insert the actuating rod in accordance with the gap of the frame. Secure the diaphragm mounting block on other side and tighten with washer and U-lock nut using the box driver. Make sure the gaps between the actuating rod and the electromagnet are even.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 6

Connect L-tube to the casing block. Secure the casing block with the screws. (4screws on each side.) Install the other casing block at the same way.

Replacing the chamber block of Hiblow HP-10/20 Series

Step 7

Secure the upper housing with the bolts. Then, replace the filter and filter cover on it. (See page 17 “FILTER CLEANING AND REPLACEMENT”)

Share this Article

Select your currency

×